Skip to main content

To The Core Lagree Fitness

This fitness studio build-out was executed with efficiency and precision. While the lighting layout and control system may appear complex, strategic planning allowed our team to complete the installation seamlessly.

A critical aspect of this project involved coordinating with existing tenants to safely integrate a new electrical service into the space. Thanks to our skilled crew, the process was smooth and minimally disruptive.

Looking for a dynamic workout? Check out @tothecore_lagree!

Location

Victor, NY

Category

Contract Type

Retail

Size

2,400 sqft

Completed

December 2024

Related Projects

Bob Johnson Buick/GMC

Bob Johnson Buick/GMC and FSI Construction needed a new ground-up dealership in Henrietta built around a prototype design that had not been constructed before. With a hard deadline in place, the project required close coordination, careful review of General Motors’ design intent, and an electrical team that could adapt without slowing the schedule.

Lumos at The Armory

Lumos at The Armory

This project included a new electrical service and power distribution system, aesthetic LED lighting, and a state-of-the-art fire alarm system.

Evolution Pilates

Evolution Pilates of Rochester

This project included aesthetic LED lighting, a networked lighting control system, and a state-of-the-art fire alarm system.

Designed and developed by